Two tenants
The one you are leaving and the one you are moving into. They must be different tenants; the target can be brand new.
Six steps, each on its own page, each with the numbers that matter and one obvious next action. Nothing changes in either tenant until you start a pass, and the source stays live until you cut over.
Less than you'd think. No agents, no service accounts, no exports.
The one you are leaving and the one you are moving into. They must be different tenants; the target can be brand new.
A Global Administrator (Microsoft 365) or super administrator (Google Workspace). They need no license and never share a password.
A person can only land on an account that exists. Create them first — Directory sync can do it from the source directory — or let the assessment tell you who is missing.
Any evening. Everything is already there by then; the window is for DNS and forwarding, not for copying.
Ten minutes, two admins, no passwords.
Permissions are requested for the workloads you ticked and nothing more. Widen the scope later and re-check; the page tells you exactly what changed.
Know the size and the snags before anything moves.
Run it as often as you like. It is free, it changes nothing, and it is the fastest way to check the target is ready.
Every person needs somewhere to land.
Once a person's migration has started, their pair is fixed, so their delta passes always land in the same place.
Pilot first, then everyone, while the source stays live.
Workers scale horizontally: add another and it picks up the next job. Locks make sure two workers never touch the same mailbox at once.
Prove it, then keep it current for as long as you need.
Verification is the difference between "it should all be there" and knowing it is. Run it before cutover and once more after.
One guided evening instead of a lost weekend.
The cutover page keeps every step, who ticked it and when — the audit trail is built in.
A pass is a chain of short, resumable jobs. Each job lists one folder or drive from a cursor, copies what it hasn't seen, records what it copied, and hands the cursor back. Ten minutes later the next slice picks up exactly where it left off.
It depends on data volume and the platforms' own rate limits far more than on MigrateX. As a rule of thumb:
A pilot in an afternoon; everyone within a day or two; cutover the following evening.
A week of waves while people keep working; delta passes nightly; cutover on a chosen evening.
Planned waves over two to four weeks, with the largest mailboxes started first. Workers scale horizontally.
Microsoft limits how fast a single mailbox can be read (around 50 GB takes a day or more). Start them early; delta passes afterwards are quick.
An owner sets up the organization and pays. Operators run projects: connect tenants, match users, start passes, cut over. Viewers watch progress and read reports — handy for the project manager and the business sponsor. Every action lands in an append-only audit log.
Create an organization, connect the source tenant and run the assessment. You will know the size of the move, and what needs fixing, before lunch.
Answers from the documentation.
Hi. Ask me what a status means, why an item stopped, or what to do next. I answer from the documentation.
I can’t change anything or see message contents. For billing or a person, use contact.